Strengthening the Al-Qassim Region Network

Installation of capacitor banks and voltage regulation equipment across 12 substations to stabilize the regional electricity grid in Al-Qassim.

Project Overview

Installation of capacitor banks and voltage regulation equipment across 12 substations to stabilize the regional electricity grid in Al-Qassim.

Do you have a similar project?

Our engineering team is ready to discuss your project requirements and provide the right solution.

Other Projects

Temporary energy infrastructure in NEOM
Energy distribution

Temporary energy infrastructure in NEOM

Deploying temporary medium-voltage power infrastructure and distribution networks to support early construction activities in NEOM.
Temporary energy infrastructure in NEOM
Supplying the Yanbu Desalination Plant with power
Industrial structure

Supplying the Yanbu Desalination Plant with power

نظام توزيع الطاقة المتوسط الكامل لمنشأة تحلية رئيسية، تشمل معدات التحويل 13.8 كيلو فولت ودمج نظام التوليد الاحتياطي.
Supplying the Yanbu Desalination Plant with power