Underground cable network in Dammam

Laying high-voltage cables and excavating trenches along a 45 km stretch in downtown Dammam to ensure reliable power distribution.

Project Overview

Laying high-voltage cables and excavating trenches along a 45 km stretch in downtown Dammam to ensure reliable power distribution.

Do you have a similar project?

Our engineering team is ready to discuss your project requirements and provide the right solution.

Other Projects

Temporary energy infrastructure in NEOM
Energy distribution

Temporary energy infrastructure in NEOM

Deploying temporary medium-voltage power infrastructure and distribution networks to support early construction activities in NEOM.
Temporary energy infrastructure in NEOM
Strengthening the Al-Qassim Region Network
Energy distribution

Strengthening the Al-Qassim Region Network

Installation of capacitor banks and voltage regulation equipment across 12 substations to stabilize the regional electricity grid in Al-Qassim.
Strengthening the Al-Qassim Region Network