Engineering, tower erection, and conductor stringing for an 85 km, 380 kV double-circuit overhead transmission line connecting the Jeddah and Makkah regions.
Engineering, tower erection, and conductor stringing for an 85 km, 380 kV double-circuit overhead transmission line connecting the Jeddah and Makkah regions.
Our engineering team is ready to discuss your project requirements and provide the right solution.